Cabling architecture guide
Relevant for these products:
- 715003 – DEFA Power S
- 715011 – Power Ready S
- 715012 – Power Ready S – IT
For installers only.
DEFA Power charging solution can be configured to protect a common upstream fuse.
With the DEFA Balancer you can additionally protect the fuse if there are unknown loads (e.g house loads).
Both DEFA Power S and Power Ready S models come with an integrated MCB (Miniature Circuit Breaker), eliminating the need for an external circuit breaker before each charging station in the system. Below are examples of common cabling infrastructure setups.
The products in system applications have the possibility to be installed with several cabling options.
Cabling architecture:
1
Flat cable
2
Individual cables
3
Common supply cable
4
Daisy chain connection
5
Daisy chain connection – poles
6
Rail connection
Published: October 27th, 2023